Above, Dave and Ellen help Sr. Rogerio frame up the top of the septic system. After framing, we mixed cement and poured/leveled the top of the septic with cement. Tomorrow, we will dig the ditch/pipe leading to the septic.
Inside, we removed the flooring, windows and doors. Watch out, Amanda can chisel like nobody's business in her Tuff Chix gloves.
We also removed the ceiling in two rooms, and we should start removing the roof tomorrow. The current roof is composed of clay tiles (and leaks), and the ceiling was made of the wood from used mining crates.
Above is a picture of the team outside the house at the end of the first day.
And today's long-distance dedication goes out to: MEG. Keep your feet on the ground and keep reaching for the stars.

Great job and what a difference your help will make to this family and their future generations. Awesome and inspirational! posted by Mary Vandehey
ReplyDeleteThank you Mary!
ReplyDelete